Origin Standard

GB/T 11147-2025 Method for sampling asphalt

AI-translated method card — human verification pending. This is not an official translation of the standard. Unclear source values remain unverified; check the original standard and product certificate before use.

Card type: Test method

1. Method number / full title / English title / replacement relationship

Main technical changes compared with GB/T 11147—2010:

2. Scope of application and non-application

3. Method principle

The source text does not provide a centralized "method principle" section. This document is a sampling method standard, specifying sampling operations and sample protection requirements according to sampling location, sample state, and container type.

4. Reagents and materials (purity / preparation)

Not provided in the available source.

5. Instruments and equipment

The source text does not provide a centralized "instruments and equipment" section. The sampling tools and devices mentioned in the text include:

6. Recommended operating conditions

The source text does not provide a centralized "recommended operating conditions" section. Relevant operating conditions are scattered throughout the sampling clauses, for example:

7. Sampling and sample preparation

7.1 Selection of sampling location (Chapter 4)

To check asphalt quality, sample at the production plant or storage site before shipment; when sampling at the production plant or storage site is not possible, sample at the delivery location at that time.

7.2 Sample amount (Chapter 5)

7.3 Sample container (Chapter 6)

7.4 Sampling method (Chapter 7)

7.4.1 Sampling from asphalt storage tanks

7.4.2 Sampling from tank cars, tank trucks, and asphalt distributors

7.4.3 Sampling from tankers and barges

7.4.4 Sampling from drums

According to the random sampling requirements of 7.5, take 1 L of liquid asphalt from thoroughly mixed drums using a sampler.

7.4.5 Sampling of semi-solid or unbroken solid asphalt

Table 1 Number of sample pieces to be taken for different numbers of loaded pieces

Number of loaded pieces/pieces Number of pieces selected/pieces
2~8 2
9~27 3
28~64 4
65~125 5
126~216 6
217~343 7
344~512 8
513~729 9
730~1000 10
1001~1331 11

7.4.6 Sampling of crushed or powdered asphalt

7.4.7 Sampling at the delivery location

7.5 Protection and storage of samples (Chapter 8)

8. Analytical procedure

Not provided in the available source. This document is a sampling method standard and has no analytical procedure chapter; sampling operations are given in Section 7.

9. Qualitative and quantitative determination and calculation formulas

Not provided in the available source.

10. Precision

Not provided in the available source.

11. Report

Not provided in the available source as an independent "Report" chapter. Requirements for sample identification and label information are given in 8.6, 8.7.

12. Normative references

13. Source and verification

This page is an AI translation of the available Chinese method card. Human verification is pending. It is not an official translation of the standard. Check the source standard and product certificate before use.

14. Quick reference for questions and answers

Question Key points of answer
What type of standard is this? Testing method standard (sampling method).
Standard number and name? GB/T 11147—2025 "Asphalt Sampling Method".
English name? Method for sampling asphalt materials.
Which version does it replace? Replaces GB/T 11147—2010.
Issue and implementation dates? Issued on 2025-10-05, implemented on 2026-05-01.
Scope of application? Sampling of asphalt materials at production, storage, or delivery locations.
Are there normative references? No.
Are there terms and definitions? There are no terms and definitions that need to be defined.
How to choose the sampling location? Sample at the production plant or storage location before shipment; if not possible, sample at the delivery location at that time.
Sampling quantity for liquid asphalt? 1 L~4 L; emulsified asphalt 4 L.
Sampling quantity for semi-solid or unbroken solid asphalt? 4 kg.
Sampling quantity for crushed or powdered asphalt? 1 kg~2 kg.
Sample container for liquid asphalt (excluding emulsified asphalt) or semi-solid asphalt? Preferably a metal container with a sealed lid.
Sample container for emulsified asphalt? Preferably a plastic container with a sealed lid.
Sample container for crushed or powdered asphalt? Preferably a metal container with a sealed lid; plastic bags may also be used, and plastic bags should have reliable outer packaging.
What should be done before sampling from a storage tank? First close the inlet valve and outlet valve.
Three sampling valve positions for the sampling valve method? Upper one-third (not less than 1 m from the tank top), middle one-third, lower one-third (not lower than 1.1 m from the tank bottom).
How much should be drained from each valve in the sampling valve method? Each sampling valve should drain at least 4 L of asphalt product before taking a 1 L~4 L sample.
What is the bottom-entry sampler method not applicable to? Not applicable to asphalt with high viscosity at storage temperature.
How should samples be taken from a storage tank with stirring equipment? First stir thoroughly and uniformly, then take 1 L~4 L from the middle of the tank by any one of the methods 7.1.2.1, 7.1.2.2, 7.1.2.3, 7.1.2.4.
When should samples be taken from the discharge valve of a tank car, tank truck, or asphalt distributor? Samples should be taken when about one-half has been discharged.
How much should be drained before sampling from a sampling valve or online sampling device? First drain 4 L of asphalt before sampling.
At least how many samples should be taken from the loading and unloading pipeline of an oil tanker or barge? Take at least three 4 L samples at uniform intervals.
For direct sampling from the outlet line of an oil tanker or barge, how many samples should be taken for a capacity of ≤4000 m³? At least five 4 L samples.
For a capacity > 4000 m³, how many samples should be taken? At least ten 4 L samples.
How much liquid asphalt should be taken from a drum? Take 1 L of liquid asphalt.
Where should samples be taken from drums, bags, or boxes of semi-solid or unbroken solid asphalt? At least 75 mm below the sample surface and inside the side of the container.
How many samples should be taken from the same batch of product? Randomly take one piece and take 4 kg according to 7.5.1 for inspection.
How should the number of pieces to be sampled from a non-same batch of product be determined? Select several pieces according to the principle of random sampling; the number of pieces equals the cube root of the total number of pieces; see Table 1.
When the number of pieces sampled exceeds one, what should the mass of each sample be? The mass of each sample should be not less than 0.1 kg; after mixing uniformly, take 4 kg for inspection.
What proportion should be sampled by mechanical conveying for bulk crushed or powdered asphalt? Sample according to 20% of the number of feed hoppers.
What proportion should be sampled for vehicle transport? Sample according to 10% of the number of vehicles.
What proportion should be sampled for transport by handcart or shoulder pole? Sample according to 2% of the number of carts or loads.
What is the total sample amount for bulk crushed or powdered asphalt? Not less than 25 kg.
Lumps visually larger than what cannot be used as test samples? Lumps larger than 250 mm.
What are the crushing time and particle size requirements? They should be crushed within 24 h into small pieces not larger than 25 mm; then further crushed into small pieces of 5 mm~10 mm.
How much should be taken from each drum, bag, or box of crushed or powdered asphalt? Take at least 0.5 kg sample from near the center of each piece, and the total sample amount should be not less than 25 kg.
When should sampling be carried out at the delivery location? Samples should be taken as soon as possible upon arrival at the destination, storage site, place of use, or during unloading.
How should samples be taken for quality arbitration? Samples should be taken jointly by both the supplier and the buyer, and after sampling both parties shall sign and seal the seals; one portion is for inspection, and one portion is retained for backup.
What should a sample label include at least? Product information or material type, and the sampling date; it is preferable to provide the sample type name, sample batch number, sampling location, sampling date and time, and sampler.
Can the marking be placed on the lid? No; marker pen markings must not be on the lid, and labels must not be affixed to the lid.
What should be noted for emulsified asphalt packaging? Package properly to prevent freezing, and the sample container should be filled full to avoid skin formation at the interface between air and emulsion.

Related public products

Method references do not confirm that a product is suitable for this edition. Check its certificate and availability.

Search related products

Source and review status

This translation has not received a complete independent technical review. Missing sections and unclear source values remain identified above.